ELC HappyLand

Earned Value Project Management (Fourth Edition) - Hardcover - GOOD

Description: Earned Value Project Management (Fourth Edition) - Hardcover - GOOD Product Id:1935589083 Condition:USED_GOOD Notes:Item in good condition. Textbooks may not include supplemental items i.e. CDs, access codes etc...

Price: 6.78 USD

Location: Montgomery, Illinois

End Time: 2024-08-18T07:06:53.000Z

Shipping Cost: 0 USD

Product Images

Earned Value Project Management (Fourth Edition) - Hardcover - GOOD

Item Specifics

Restocking Fee: No

Return shipping will be paid by: Seller

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money Back

Return policy details:

Brand: Unbranded

MPN: Does not apply

Item Length: 10in.

Item Height: 0.8in.

Item Width: 7in.

Author: Quentin Fleming, Project Management Institute, Joel M. Koppelman

Publication Name: Earned Value Project Management-Fourth Edition

Format: Trade Paperback

Language: English

Publisher: Pro-Ject Management Institute

Publication Year: 2010

Type: Textbook

Item Weight: 24.4 Oz

Number of Pages: 231 Pages

Recommended

50 Unpainted Round Lead Jig Heads Fishing  1/32 1/16 1/8 1/4 3/8 1/2 3/4 1 ounce
50 Unpainted Round Lead Jig Heads Fishing 1/32 1/16 1/8 1/4 3/8 1/2 3/4 1 ounce

$3.99

View Details
Bee Venom Gynecomastia Heating Oil, Men Therm Bee Venom, for Chest~US
Bee Venom Gynecomastia Heating Oil, Men Therm Bee Venom, for Chest~US

$5.99

View Details
XXL Load Semen Volumizer for Men. Increase Ejaculation & Load Volume 60 Pills
XXL Load Semen Volumizer for Men. Increase Ejaculation & Load Volume 60 Pills

$29.99

View Details
Lot Of 5 Cincinnati Bengals Embroidered Iron On Patch NFL FOOTBALL With B
Lot Of 5 Cincinnati Bengals Embroidered Iron On Patch NFL FOOTBALL With B

$14.99

View Details
Saquon Barkley #26 Penn State blue/white Jersey Men’s Size S-3XL
Saquon Barkley #26 Penn State blue/white Jersey Men’s Size S-3XL

$37.99

View Details
720P USB Webcam With Built in Microphone, & Noise reduction.
720P USB Webcam With Built in Microphone, & Noise reduction.

$4.97

View Details
Blackfish Tog Porgy Seabass Trigger Jig Lure 2x Mustad Ultra Point Hook
Blackfish Tog Porgy Seabass Trigger Jig Lure 2x Mustad Ultra Point Hook

$2.75

View Details
Unbranded Design Graphic Socks Unisex One Size Fits All With Free Shipping
Unbranded Design Graphic Socks Unisex One Size Fits All With Free Shipping

$19.99

View Details
50 Unpainted Tungsten Teardrop Slotted Beads without Fishing Hook: 3 4 5 6 7 8mm
50 Unpainted Tungsten Teardrop Slotted Beads without Fishing Hook: 3 4 5 6 7 8mm

$9.99

View Details
Pack of 100, 28.5mm Plastic Round Bases Miniature Wargames Table gaming TEXTURED
Pack of 100, 28.5mm Plastic Round Bases Miniature Wargames Table gaming TEXTURED

$11.99

View Details